HIT Building: Electric Power Interruption on Monday, 15th of July
Due to a test relating the electric power supply of the HIT building there will be a planed interruption from 6:30am to 9:30am on Monday the 15th of July.
Please note that the whole HIT building will be without electric power during this time (The server room HIT D 13 is excluded from this interruption). Shutdown your computer and switch off (use main switch if available or unplug) your electrical devices in advance to avoid local data loss and help prevent start-up peaks when electric power is switched back on.