Network renovation in HPT

This one goes out to all HPT inhabitants. As you might have noticed, the HPT network infrastructure is currently being remodelled. In order to be able to take full advantage of the new uplink cables and access switches, ideally all grey patch cables (from the wall sockets to the devices) should be replaced as well (the blue ones are OK). We do realize that this is not realistic in many (lab) settings, but please swap them out for new cat6 cables whenever you can (they're available in the D-PHYS Shop). Don't hesitate to contact us if you have questions.

Tags: